We were asked to install a new Treatment Plant at this property as the original Septic Tank had failed,  upon investigation we also found some cross connection issues which meant that surface water was flowing into the foul system.

 

We installed a new Treatment plant, re laid all the drains to the new plant and re routed the the Surface water away from the plant to a ditch

 