Re Route Pipework And Install New Gully

We were asked to attend this property to investigate why a kitchen gully was continually backing up. Upon attendance it was discovered that the drain leading away from the gully had been capped off when a new building had been put. We advised the customer that the most cost effective solution would be to install a new gully around the other side of the kitchen and re route the waste pipe round to this point.

The customer accepted our proposal and an excavation team attended, dug out a new trench for the gully and pipework, installed the new gully and connected to the system. This excavation was then backfilled and the concrete re instated. The kitchen waste pipes were then re routed around the kitchen and into the new gully.

Should you have a similar problem contact us 01253 811181 info@pipescan.co.uk

Keywords: Drain Relay, Drain Repair, Excavation, Concrete, Gully, Kitchen Waste Pipe